Masa sawing plant
Porta Westfalica 1 Mar 2021 - Besides the standard plane elements, typically 20 - 30 % of ready-made, prefabricated fitting pieces are used when building walls. On the construction site, sawing the products is a time-consuming and labour-intensive activity, whereas in the sand lime factory it can be done much more economically. Masa has a proven solution for the production of these precisely fitting supplementary bricks.
Read the full report published in AAC worldwide 01/2021.
Report on the Masa sawing plant